Great Works

PROTAGONISTI IN ITALIA E NEL MONDO

thumb1thumb2thumb3

 

CO-GENERATION AND TRI-GENERATION STATIONS

CABINATI A PROGETTO @60OPERA FINITA CGE JMS 1000KVACABINATI APROGETTO @60 900KVA

 

TEST ROOMS FOR BIG ENGINES

They are rooms dedicated to the test of the engines where they are checked on the base of their use, in most cases for a maritime use.

The project foreseen a segregation in two cells in a variable layout with a maximum  inclination of 18°.

ASSEMBLY PHASES

SALA COLLAUDI PER GRANDI PROPULSORISALA COLLAUDI PER GRANDI PROPULSORISALA COLLAUDI PER GRANDI PROPULSORI

 

TEST ROOMS GE >2000 KVA

The project foreseen the possibility to test many engines at the same time till 6 MW. The ventilation system foreseen a partial  recovery of the dissipated heat, while the combustion gases are expelled outside through a forced ventilation.

BEFORE AND AFTER THE INSTALLATION

VISTA DALL’ESTERNO ANTE-OPERAMPOST-OPERAM

 

SOUNDPROOF CANOPIES FOR METAL GRINDING LINES

Projects have been studied on the purpose to remain in the noise limits, foreseen by the current regulations.

For any further information please contact our technical office.

LATO ACCESSO AI QUADRILATO CARICAMENTOFRONTE NASTRO RACCOLTA

 

AERIAL REFRIGERATION

BEFORE AND AFTER THE INSTALLATION

AEROTERMO ASTRAPARTICOLARE SETTO SP.ASPIRAZIONE

 

CEMENT MIXER BOX - LOADING INERT AREA

ASSEMBLAGGIOOPERA FINITAAREA CARICAMENTO INERTI NOVATE M.(MI)